At a glance
UDAN (Ude Desh ka Aam Nagrik, "let the common citizen fly") is the Regional Connectivity Scheme (RCS) of the Ministry of Civil Aviation. It pays airlines a subsidy, called viability gap funding, to fly routes to unserved and under-served airports, in return for capping fares on part of the seats. It was launched in 2016 and has been extended to 2035-36 as Modified UDAN.
Key facts
- Launched: 21 October 2016
- Policy basis: National Civil Aviation Policy (NCAP), 2016
- Ministry: Civil Aviation
- Implementing agency: Airports Authority of India (AAI)
- First flight: Shimla–Delhi, 27 April 2017
- Original fare cap: ₹2,500 for about half the seats on a one-hour (about 500 km) flight, later indexed to inflation
- Funding: viability gap funding (VGF), originally 80% from the Centre (via a levy on flights on major routes) and 20% from States
- Ten-year record (Ministry factsheet, October 2026): 625 routes, 90 airports (including 15 heliports and 2 water aerodromes), more than 1.49 crore passengers
- Modified UDAN: launched 4 July 2026; ₹28,840 crore for FY 2026-27 to FY 2035-36
- Modified UDAN targets: 120 new destinations; about 4 crore more passengers; 100 airports from unserved airstrips; 200 helipads
How it works
The bargain. Airlines bid for a route. The one asking for the least VGF usually wins and gets exclusive rights for a fixed period. In return it must keep a set number of seats at capped fares. The Centre, States and airport operators add concessions: lower landing and parking charges, and States cut VAT on aviation turbine fuel to 1% or less.
Original vs Modified UDAN.
| Feature | UDAN (2016) | Modified UDAN (2026) |
|---|---|---|
| Subsidy period | 3 years | 5 years |
| Funding | Partly from a levy on major-route flights | Direct budget support |
| Focus | Reviving unused airstrips | 120 new destinations, helipads in hilly, remote and island areas, upkeep of low-traffic aerodromes |
Variants. Krishi UDAN (air transport of farm produce, mainly from the North-East, hill and tribal areas), UDAN International (from some North-Eastern airports) and helicopter and seaplane routes.
Weak spot. Many routes stopped once the subsidy ended; only about 7–10% stayed viable on their own, a key reason for the redesign.
Timeline
- 2016: NCAP announced (June); UDAN launched (21 October)
- 2017: first UDAN flight, Shimla–Delhi (27 April)
- 2025: Union Budget announces a revamped UDAN for 120 new destinations
- 2026: Modified UDAN launched (4 July); scheme completes ten years (21 October)
Recent developments
- 21 Oct 2026: UDAN completed ten years. The Civil Aviation Ministry reported 625 routes and more than 1.49 crore passengers over the decade.
- 4 Jul 2026: Modified UDAN launched with ₹28,840 crore for FY 2026-27 to FY 2035-36, aiming at 120 new destinations.
Exam traps
- UDAN is run by the Ministry of Civil Aviation, implemented by AAI; it is not a NITI Aayog or Railways scheme.
- The first flight was Shimla–Delhi (2017), though the scheme was launched in 2016.
- UDAN stands for Ude Desh ka Aam Nagrik.
- Krishi UDAN moves farm produce; it is not a passenger scheme.
- Don't confuse UDAN (aviation) with UDAY (power distribution companies) or UDID (disability ID).
Quick check
- Q: Under which policy was UDAN launched? A: The National Civil Aviation Policy, 2016.
- Q: Which agency implements UDAN? A: The Airports Authority of India.
- Q: What is the outlay of Modified UDAN? A: ₹28,840 crore, for FY 2026-27 to FY 2035-36.
Further reading
Sources
- https://www.newkerala.com/news/a/udan-scheme-clocks-149-crore-passengers-govt-aims-243.htm
- https://telanganatoday.com/udan-clocks-10-years-connects-1-49-crore-passengers-across-india
- https://www.drishtiias.com/daily-updates/daily-news-analysis/modified-udan-scheme/print_manually
- https://factly.in/government-launches-regional-connectivity-scheme-udan/
- https://www.clearias.com/rcs-udan-scheme/
In the news
Every time this topic has appeared in our current affairs, newest first:
- Week of 15–21 October 2026UDAN regional air connectivity scheme completes 10 years